New Build/New Roof – Slad, Stroud

 

A larger job recently finished. This building job was in Slad (near Stroud).

A brand new build consisting of cutting the roof on, with felt and battons, tiling, lead valleys and the lead work around the chimney.

 

2014-03-11 16.37.42 2014-03-18 14.39.40 2014-03-18 14.39.52 2014-03-18 14.40.22 2014-03-18 14.40.25 2014-03-18 14.40.49 2014-03-18 14.41.03 2014-03-19 12.59.12 2014-03-26 15.51.21 2014-03-26 15.51.26 2014-03-26 15.51.41 2014-03-26 15.51.49 2014-03-28 16.10.53 2014-03-28 16.11.02 2014-03-28 16.11.14 2014-03-28 16.11.22